Integral Group
Calgary Design Studio – Telus Sky

Aiming to be the greenest office fit out in Calgary, we are targeting LEED Platinum Certification, FitWell, and shadowing WELL standards. Our most ambitious target of all is aiming for 100% waste diversion from landfill. This goal alone set the bar for materials selections as all off cuts need to be incorporated into the design or recyclable.

Through the design we have worked closely with the Construction Manager to salvage materials and products that will enhance the design and would have otherwise been destined for the landfill. Butcher block counter tops have been reclaimed from a kitchen renovation project, reclaimed plywood from packing crates will be replacing gypsum wall board, and a feature wall is being created using sealed glass unit samples salvaged from suppliers, architects and envelope consultants. These samples are created for all projects and cannot be recycled.

Location:

Calgary, Alberta

Client: 

Integral Group

Date Completed: 

2021

Size:

8,132 ft2

LOLA Team: 

Erica Lowe

Consultant Team:

Integral Group – Mechanical
Integral Group – Electrical
Integral Group – LEED & Green Building Consulting

Contractor: 

Eton-West Construction

Images: 

Photography by Chris Amat